Skip to content
ARAZCONSTRUCTION GROUP

004 / Costa Mesa / Detached accessory dwelling unit

Costa Mesa ADU

A backyard unit run like our larger work: the lot understood first, the price moving with the drawings, the systems built in.

Peaked roof trusses and wall framing on a house under construction against a blue sky

A detached backyard unit, run the way we run larger work: understand the lot before promising a number.

Access, setbacks, the sewer lateral, and the panel capacity were resolved before design committed. The price developed with the drawings, so the owners watched the number settle instead of jump.

The unit went in with its electrical infrastructure sized for what the property will need next, not just what the code asked for on the day it was permitted.

They told us what the lot would support before we paid for drawings, and the unit came in the way they said it would.
Homeowner, Costa Mesa

Before / after

Nearly finished single-family unit with siding on and a dirt front yard
Two workers pouring concrete into a rebar-lined foundation form in a residential backyard

Backyard pour to weather-tight unit

Solar panels installed across a finished rooftop, seen from above
Timber roof trusses and wall framing on a unit under construction

Roof framing to solar array

Next project

Harbor Boulevard Mixed-Use

Building in Costa Mesa?

Send us the address or the plans. We'll tell you what it will support and what it will cost to build there.

Book a site visit