001 / Anaheim / Podium apartments over retail

Harbor Boulevard Mixed-Use

A mid-block infill site taken from rough grade to a podium building with its charging infrastructure designed in, not added on.

Multi-story podium building under construction, concrete decks and orange safety railing against a clear sky

The site came to us as rough grade on a busy corner: a small infill lot with utilities in the wrong place and a podium building that had to hold both parking and retail frontage. We took the civil package, the deck, and the structure as one scope.

That mattered most at the podium pour. The crew forming the deck worked for the same company that had priced it, so when the soils report and the field disagreed, the fix was absorbed inside one schedule instead of negotiated between three.

The charging and electrical infrastructure was engineered alongside the structure rather than after it, which is increasingly the difference between a building that passes plan check and one that gets redesigned there.

They priced the podium deck while we were still moving columns. When the drawings landed, the number barely moved.
Development manager, Anaheim

Before / after

Street-level view of a finished modern building with brick and glass facade
Multi-story concrete building under construction with exposed rebar and plywood formwork

Podium deck to occupied frontage

Electric vehicle plugged into a fast-charging station in a covered parking bay
Open electrical panel with a row of circuit breakers and rough-in wiring

Electrical rough-in to charging bay